Coordination

Coordination





The BIM model-initially produced by the design team-can be utilized by the entire A/E/C team and joined together with the models produced by system subcontractors. The technology and practice is bringing earlier into the design process techniques that subcontractors and fabricators have been using for years: mechanical, electrical, and fire suppression subcontractors have been utilizing three dimensional (3D) software to design and detail their systems, and then these models have been used to produce shop drawings as well as aid in manufacture of the system pieces. Now 3D models are allowing for the virtual construction and layout of the building structure and systems prior to the start of construction, from the HVAC conduit to drywall. DKE is working earlier than ever with architects, other engineers, and contractors to coordinate our work with others in 3D reality.